+212 7 67 66 51 55 contact@dssf.fr Academy platform
Request an assessment
Smart City & Building unit

BIM design office

Models that serve from competition to construction, then into operation: digital with BIM, physical to convince. Our BIM design office is headquartered in Tangier, with sites in Kenitra, Casablanca and Agadir.

BIM modelling

Architecture, structure and MEP models, construction CAD drawings.

Scan-to-BIM

Laser survey of existing assets and as-built model, building or plant. Scan-to-BIM in detail

BIM coordination and clash detection

Clash detection only matters if it leads to dated, owned decisions. We run the coordination reviews, rank conflicts by site impact and record each resolution in the model.

BIM consulting and ISO 19650

BIM charter and execution plan, requirements, client-side support.

BIM for operations and digital twin

As-built model linked to BMS and CMMS to run the delivered building.

Physical models

Taken straight from the BIM model and 3D printed. Our architectural models

What we deliver

  • Georeferenced point cloud and scan-to-BIM model
  • Coordinated discipline models and dated clash reports
  • Quantities extracted from the model
  • Digital as-built and asset register ready for CMMS
  • Project BIM protocol and naming conventions
  • Training of the client’s teams in using the model

Project : As-built model of a running plant

High-precision laser scanning: the first reliable digital baseline of the facility.

Frequently asked questions

What is scan-to-BIM and when do you need it?

It is the creation of a BIM model from a laser survey of the building or plant as it exists. It is used before a renovation, an extension, a compliance upgrade or the set-up of facility management.

Do you make physical architectural models?

Yes. Our BIM design office takes the physical model straight from the digital model and 3D prints it, for a competition, a sales campaign or a public presentation.

Where do you start a digital twin project?

With a one-to-two-week scoping: which decisions the twin must inform, which data already exists, which scope to test. A four-to-eight-week POC then confirms the value before any roll-out.

BIM model of a building coordinated across architecture, structure and MEP

A project?

Describe your need or send your files: we come back with feasibility and lead time.

Request an assessment

WhatsApp